PRE-ENERGIZATION CHECK 
 
 
 
 
 
GENERAL 
 
BEFORE ENERGIZING THE CONTACTOR for 
the first time, follow the procedure below to verify 
that  the  equipment  is  properly  installed  and 
functional. 
 
Hazardous Voltage. Turn off 
and lock out all primary and 
control circuit power 
sources prior to performing 
this pre-energization check. 
 
Do not operate this 
equipment until a complete 
safety inspection has been 
made. 
 
Do not energize damaged 
equipment that has not 
been repaired or verified. 
 
Do not remove, cover or 
destroy any safety signs. 
 
Do not operate this 
equipment if any panels or 
covers have been removed. 
 
  All blocks or other temporary braces used for 
shipment must be removed. 
 
  Install  all  panels,  guards,  and  covers  if 
removed. 
 
  Check for any loose connections and confirm 
that all wiring is correct per wiring diagrams. 
 
  A  supply  of  spare  parts  should  be 
established. 
 
  Instruction manuals and diagrams should be 
collected and filed. 
 
 
 
 
 
ELECTRICAL CHECKS 
 
Electrical shock hazard.  
Do not touch energized 
components during a test 
using auxiliary power. 
 
An electrical insulation resistance test should be 
performed  to  verify  that  the  contactor  and 
associated field wiring are free from short circuits 
and  grounds.  Refer  to  the  MAINTENANCE 
Section of this manual for additional information. 
 
Hazardous voltages are 
present during dielectric 
testing which can result in 
serious injury or death.  
High potential tests should 
be performed only by 
qualified personnel. 
 
    
DANGER
 
    WARNING 
    WARNING 
    WARNING 
    WARNING 
   WARNING
   WARNING
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: info@ctiautomation.net