Toshiba HCV-1JBU Instruction Manual

Page of 30
 
MAINTENANCE 
 
Page 17 
 
 
 
RECOMMENDED INSPECTION AND 
MAINTENANCE TYPES 
 
NOTE:   Refer  to  the  SAFETY  section  of  this 
manual for important information.  
 
1.  Acceptance Inspection 
 
 
This inspection confirms that the contactor is 
complete,  correct  as  specified  and 
undamaged  from  shipment.  The  procedure 
for  this  inspection  is  outlined  in  the 
RECEIVING, 
INSPECTION 
AND 
HANDLING section of this manual. 
 
2.  Patrol Inspection 
 
 
Inspection  is  made  of  the  condition  of  the 
contactor  while  it  is  energized.    Check  that 
no unusual sounds or smells exist externally. 
Check for any abnormal discoloration due to 
overheating.  Inspect for signs of damage to 
the insulation frame, OPEN/CLOSE indicator 
and other components. 
 
Inspection Frequency: Once every 6 months 
 
3.  Periodic Inspection 
 
 
Inspection  is  performed  with  the  contactor 
de-energized.  The lubrication of sliding and 
rotating parts is checked and the mechanism 
is lubricated if needed. 
 
Inspection Frequency: Once every 1-2 years 
or every 20,000 operations (normal). 
 
NOTE: 
Refer to Table 2 for the schedule of 
Periodic Inspections. 
 
4.  Unscheduled Inspection 
  
Inspections are implemented as required. 
 
Inspection Frequency: As needed 
 
NOTE: 
The inspection frequency and points 
to be inspected may vary from the 
above recommendations depending 
on the status of use, frequency of 
switching and other factors. 
 
 
 
Table 1 - Tightening Torque 
Screw Nominal 
Diameter 
Tightening Torque 
M4 
15-20 kgf-cm (13-17 in-lb) 
M5 
30-40 kgf-cm (26-34 in-lb) 
M6 
50-65 kgf-cm (43-56 in-lb) 
M8 
120-150 kgf-cm (9-11 ft-lb) 
M10 
250-315 kgf-cm (18-23 ft-lb) 
M12 
450-565 kgf-cm (32-41 ft-lb) 
 