APC PDPM144F User Manual
c. Short Circuit Withstand Rating:
[PDPM144kW: 10kA Symmetrical, 240V maximum]
[PDPM277H: 10kA Symmetrical]
[PDPM277H: 10kA Symmetrical]
d. Rated Impulse Withstand Voltage (UCC):
[PDPM144kW: 4kV]
[PDPM277H: 4kV]
[PDPM277H: 4kV]
4.
Output:
a. Nominal Output:
a. Nominal Output:
[144kW, 120/208V 3-phase, 400A maximum, 3-Wire + N + G]
[277kW, 400V 3-phase, 400A maximum, 3-wire + N + G]
[277kW, 400V 3-phase, 400A maximum, 3-wire + N + G]
1.4 SUBMITTALS
A.
Product Data: Submit product data showing material proposed. Submit sufficient
information to determine compliance with the Drawings and Specifications. Product data
shall include, but shall not be limited to, the following:
1.
information to determine compliance with the Drawings and Specifications. Product data
shall include, but shall not be limited to, the following:
1.
As bid system bill of materials.
2.
Product catalog sheets or equipment brochures.
3.
Product guide specifications.
B.
Shop Drawings: Submit shop drawings for each product and accessory required. Include
information not fully detailed in manufacturer’s standard product data, including, but not
limited to, the following:
1.
information not fully detailed in manufacturer’s standard product data, including, but not
limited to, the following:
1.
Installation information, including, but not limited to, weights and dimensions.
2.
Information about terminal locations for power and control connections.
3.
Drawings for requested optional accessories.
C.
Wiring Diagrams: Submit wiring diagrams detailing power systems, clearly differentiating
between manufacturer-installed wiring and field-installed wiring, and between components
provided by the manufacturer and those provided by others.
1.
between manufacturer-installed wiring and field-installed wiring, and between components
provided by the manufacturer and those provided by others.
1.
Submit system single-line diagram.
D.
Operation and Maintenance Data: Submit operation and maintenance data to include in
operation and maintenance manuals including, but not limited to, safe and correct operation
of UPS functions.
1.
operation and maintenance manuals including, but not limited to, safe and correct operation
of UPS functions.
1.
Submit an installation manual, which shall include, but shall not be limited to,
instructions for storage, handling, examination, preparation, installation, and start-up of
UPS.
instructions for storage, handling, examination, preparation, installation, and start-up of
UPS.
2.
Submit an operation and maintenance manual, which shall include, but shall not be
limited to, operating instructions.
limited to, operating instructions.
1.5 QUALITY ASSURANCE
A.
Qualifications:
1.
1.
Manufacturer Qualifications: Manufacturer shall be a firm engaged in the
manufacture of modular PDUs of types and sizes required, and whose products have
been in satisfactory use in similar service for a minimum of 20 years.
a. The manufacturer shall be ISO 9001 certified and shall be designed to
manufacture of modular PDUs of types and sizes required, and whose products have
been in satisfactory use in similar service for a minimum of 20 years.
a. The manufacturer shall be ISO 9001 certified and shall be designed to
internationally accepted standards.
B.
Regulatory Requirements: Comply with applicable requirements of the laws, codes,
ordinances, and regulations of Federal, State, and local authorities having jurisdiction.
Obtain necessary approvals from such authorities.
1.
ordinances, and regulations of Federal, State, and local authorities having jurisdiction.
Obtain necessary approvals from such authorities.
1.
Work shall also be designed in accordance with the following:
a. NFPA
a. NFPA
70
Page 3
1/17/2011