Alliance Laundry Systems T433I User Manual

Page of 116
Electrical Requirements
47
M414038
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Jumper Configuration Instructions
OPL Micro Control Models Only
Changing the transformer configuration jumper is 
required if any of the following apply:
You have 208 Volt service and are connecting a 
gas or steam model rated for 208 Volt or 
240 Volt.
You have 415 Volt service and are connecting a 
gas or steam model rated for 380 Volt or 
415 Volt.
To configure your 208 Volt or 240 Volt tumbler for 
208 Volt operation, you must remove the 240 Volt 
configuration jumper located in the contactor box and 
replace it with the 208 Volt jumper supplied with the 
literature packet. This must be done prior to supplying 
power to the machine. Failure to install proper 
configuration jumper may result in damage to sensitive 
electronic controls and may void warranty.
To configure your 380 Volt or 415 Volt tumbler for 
415 Volt operation, you must remove the 380 Volt 
configuration jumper located in the contractor box and 
replace it with the 415 Volt jumper supplied with the 
literature packet. This must be done prior to supplying 
power to machine. Failure to install proper 
configuration jumper may result in damage to sensitive 
electronic controls any may void warranty.
Ferrite Ring Installation
OPL Micro Control Models Only
The ferrite ring provided in the literature packet must 
be installed over the power leads during connection of 
electrical service. The ferrite protects the sensitive 
electronic controls from destructive electrical 
disturbances which may be present on power lines to 
the machine. Failure to properly install the ferrite ring 
may result in damage to the electronic controls and 
will void control warranty.
To Install:
1. Immediately after connection of power leads and 
before applying power to machine, locate each of 
the incoming service leads including ground.
2. Snap the ferrite ring closed over all the service 
leads inside of the contactor box as shown. It is 
important that the ferrite ring be installed inside 
the contactor box. Refer to Figure 19. Do not 
install the ferrite outside of the box or other area. 
Make sure that service leads are in the center of 
the ferrite before closing the ring so not to pinch 
or damage leads.
Figure 19 
T225S
1
Contactor Box
2
Ferrite Ring
3
Jumper
T225S
1
2
3