Delta Tau GEO BRICK LV User Manual

Page of 271
Geo Brick LV User Manual
 
Motor Setup 
 193 
 Open-Loop Test, Encoder Decode: I7mn0 
Having phased the motor successfully, it is now possible to execute an open loop test. The open-loop test 
is critical to verify that the direction sense of the encoder is the same as the command output. 
 
A positive command should  create a velocity and position counting  in the positive  direction; a negative 
command should create a velocity and position counting in the negative direction. The open-loop test can 
be  done  manually  from  the  terminal  window  (e.g.  #1O5)  while  gathering  position,  velocity  data,  or  by 
simply monitoring the direction of the velocity in the position window. The PMACTuningPro2 Software 
provides an automatic open loop utility, which is convenient to use. 
 
A successful open-loop test should look like the following: 
 
The  open  loop  magnitude  (output)  is  adjustable,  start  off  with  1  -  2  percent  command  output  and 
increment gradually until you see a satisfactory result.