GE CVM1750SHSS Installation Instruction

Page of 48
 19
Installation Instructions
 USE TOP CABINET TEMPLATE  
FOR PREPARATION OF TOP CABINET
C2
     
RECIRCULATING
 
(Non-Vented Ductless)
INSTALLATION OVERVIEW
C1. Attach Mounting Plate to Wall
C2. Prepare Top Cabinet 
C3. Adjust Blower
C4. Mount the Oven
C5. Install Charcoal Filter (not supplied)
  Read the instructions on the TOP CABINET 
TEMPLATE.
  Tape it underneath the top cabinet.
  Drill the holes, following the instructions on the TOP 
CABINET TEMPLATE.
CAUTION:
 Wear safety goggles when 
drilling holes in the cabinet bottom.
You need to drill holes for the top support screws and  
a hole large enough for the power cord to fit through.
C
  Place the mounting plate against the wall and insert 
the toggle wings into the holes in the wall to mount 
the plate.
NOTE: Before tightening toggle bolts and wood screw, 
make sure the tabs on the mounting plate touch the 
bottom of the cabinet when pushed flush against the 
wall and that the plate is properly centered under the 
cabinet.
CAUTION:
 Be careful to avoid pinching 
fingers between the back of the mounting plate and 
the wall.
  Tighten all bolts. Pull the plate away from the wall  
to help tighten the bolts.
3
 ATTACH THE MOUNTING PLATE  
TO THE WALL
C1
Attach the plate to the wall using toggle bolts. At least 
one wood screw must be used to attach the plate to  
a wall stud.
  Remove the toggle wings from the bolts. 
  Insert the bolts into the mounting plate through  
the holes designated to go into drywall and reattach 
the toggle wings to 
3
ø
4
s onto each bolt. 
1
4
Wall
Mounting 
Plate
Spacing for 
Toggles More Than 
Wall Thickness
Bolt End
Toggle  
Bolt
Toggle Wings
To use toggle bolts:
2