Bunn 41343 Manuel D’Utilisation

Page de 40
Page 28
PROGRAMMING FUNCTIONS - (cont.)
SET PREINFUSION
  This function allows the operator to set an initial 
soaking of the grounds and a delay time, before the 
complete brew cycle starts.
Procedure to set preinfusion time:
Range:   On time - off to 4 minutes.
 
Off time - off to 4 minutes for all three batch 
sizes.
NOTE: If the brewer is already in the SET PREINFUSION 
screen, it is not necessary to follow steps 1 through 9 
in this section, but proceed directly to step 10.
1.  Press and hold the upper right hidden switch until 
the display reads UNITS. Release switch. Press 
and release upper right hidden switch until the 
display reads REVIEW RECIPES.
2. Press YES to proceed. The display should now 
read NO-NAME LEFT, along with MODIFY, SHOW 
and NEXT.
3.  Press and release NEXT to advance to the desired 
coffee name to be modified.
4.  Press and release MODIFY. The display should  
now read BREW OZ. 
5.  Press and release DONE. The display should now 
read 3 BATCHES DONE?.
6.  Press and release YES. The display should now 
read % BYPASS. 
7.  Press and release DONE. The display should read 
3 BATCHES DONE?.
8.  Press and release YES. The display should now 
read SET PULSE BREW. 
9.  Press and release NO. The display should now 
read SET PREINFUSION. 
10. Press YES to proceed. The display should now 
read ON TIME and a batch light will be blinking.
11. Select the batch to be modified.
12. Using (-) and (+), set the amount of time the brew 
water will initially presoak the grounds for that 
particular batch size. 
13.  When finished, press another batch size and repeat 
until all three batch sizes are set.
14. When finished, press DONE. The display should 
now read OFF TIME and a batch light will be blink-
ing.
15. Using (-) and (+), set the amount of time the brew 
cycle will delay (after the presoak cycle shuts off) 
before resuming brewing.
16.  When finished, press another batch size and repeat 
until all three batch sizes are set.
17. When finished, press DONE. The display will show 
the ON and OFF TIMES that were entered for each 
particular batch size.
18. After a 5 second delay, the display should read 
3  BATCHES DONE?. If the three batches are not 
complete, press NO in order to return to SET 
PREINFUSION,  and repeat steps 10 through 14.
19. If the three batches are done, press YES. This will 
advance to the next function, SET DRIP TIME.
20. Press and release either ON/OFF switch located 
on the front switch panel to exit the PreINFUSION 
function and return to the MAIN SCREEN.
EXIT TO
NEXT FUNCTION
SCREEN
REVIEW RECIPES?
 NO 
YES
EXIT TO
NEXT FUNCTION
SCREEN
NO-NAME LEFT
MODIFY SHOW NEXT
NO-NAME
MODIFY SHOW NEXT
DUAL
BREWERS
SINGLE
BREWERS
BREW OZ. XX.X
 (-) DONE (+)
3 BATCHES DONE?
 NO 
YES
% BYPASSS XX.X
 (-) DONE (+)
SET PreINFUSION?
 NO 
YES
3 BATCHES DONE?
 NO 
YES
SET PULSE BREW?
 NO 
YES
ON TIME:  X:XX
 (-) DONE (+)
OFF TIME:  X:XX
 (-) DONE (+)
3 BATCHES DONE?
 NO 
YES
41343 080108