SEAL AQUA AS-1600 사용자 설명서

다운로드
페이지 20
 
Section 2.  Operating Procedures 
 
 
12 
2.  Pre-heat the Laminator 
All Pre-heat control operations are controlled from the Control Panel as shown in 
Figure 2.2 
1.  Switch machine to START at the Main Power Switch 
• 
Laminator will power-up  
• 
Dryer Panel is in the UP position. 
• 
Heaters are OFF. 
 
 
Figure 2.2  Heater Control locations 
2.  On the Heater Controller, press and hold the  SET  button to check the set-point 
temperature.  Adjust the set point by holding the SET button down and using the 
UP/DOWN arrows to scroll to the desired temperature setting. 
Note:  Most vinyl’s run well with a SET POINT temperature of 315°C (600°F) 
dependent on speed. 
3.  Press the Heater Switch to ON to power the Dryer Panel and begin heating.  
4.  Once the machine reaches its SET POINT it is ready to be operated. 
 
Set Button 
 
 
Up Button 
 
 
Down Button