installation
location
The  refrigerated  merchandisers  have  been  designed  for 
use only in air conditioned stores where temperature and 
humidity are maintained at or below 75°F and 55% relative 
humidity. DO NOT allow air conditioning, electric fans, ovens, 
open doors or windows (etc.) to create air currents around 
the merchandiser, as this will impair its correct operation.
Product  temperature  should  always  be  maintained  at  a 
constant and proper temperature. This means that from the 
time the product is received, through storage, preparation 
and  display,  the  temperature  of  the  product  must  be 
controlled to maximize life of the product.
Uncrating the Stand
Place  the  fixture  as  close  to  its  permanent  position  as 
possible. Remove the top of the crate. Detach the walls 
from each other and remove from the skid. Unbolt the case 
from the skid. The fixture can now be lifted off the crate 
skid. 
lift only at base of stand!
exterior loading
These  models  have 
not  been  structurally  designed  to 
support excessive external loading. 
do not walk on their 
tops; This could cause serious personal injury and damage 
to the fixture.
GLASS BREAKAGE MAY OCCUR!
Retighten glass along clamshell after
leveling and first time case is brought
to full operating temperature!
glass adjustment
During  shipment,  the  lubricant  inside  the  cylinders  may 
have settled. This settling may cause excessive or uneven 
tension on the glass - to the point of breakage. To avoid 
any damage, please follow these three easy steps:
1.   Slowly raise and lower each glass section 6 times to 
a height of 6 inches.
.   Increase the height to 1 inches, and raise and 
lower the glass 6 more times.
3.   Finally raise the glass to its full extension, and lower.
These steps should release any settled lubricant within the 
cylinders and prevent any stress on the front glass.
Setting and Joining
The sectional construction of these models enable them to 
be joined in line to give the effect of one continuous display. 
A joint trim kit is supplied with each joint.
leveling
iMPoRtant!  it  iS  iMPeRative  that  caSeS  Be 
leveled fRoM fRont to BacK and Side to Side 
PRioR to Joining. a level caSe iS neceSSaRY 
to inSURe PRoPeR oPeRation, wateR dRainage, 
PleXiglaSS alignMent.
NOTE:   A. To avoid removing concrete flooring, begin lineup  
 
leveling from the highest point of the store floor.
 
B. When wedges are involved in a lineup, set them first.
All  cases  were  leveled  and  joined  prior  to  shipment  to 
insure the closest possible fit when cases are joined in 
the field. When joining, use a carpenters level and shim 
legs accordingly. Case must be raised correctly, under legs 
where support is best, to prevent damage to case.
1.   Check level of floor where cases are to be set. 
Determine the highest point of the floor; cases will 
be set off this point.
2.   Set first case, and adjust legs over the highest part 
of the floor so that case is level. Prevent  
damage - case must be raised under leg or by use 
of x6 or x4 leg brace. Remove side and back leg 
braces after case is set.
3.   Set second case as close as possible to the first 
case and level case to the first using the instructions 
in step one. 
4.   Apply masking tape 1/8” in from end of case on 
inside and outside rear mullion on both cases to be 
joined.
5.   Apply liberal bead of case joint sealant (butyl) to 
(dotted area shown in figure) first case. Apply heavy 
amount to cover entire shaded area.
DO NOT USE PERMAGUM!
It is the contractor’s responsibility to install
case(s) according to local construction and
health codes.
6.   Slide second case up to first case snugly. Then level 
second case to the first case so glass front, bumper 
and top are flush.
7.   To compress silicone at joint, use two Jurgenson wood 
clamps. Make sure case is level from front to back and 
side to side on inside bulkheads at joint.
8.   Attach sections together via a  bolts located in the 
base of the case. Secure the overhead structure by 
bolting the bracket, located inside behind lights.
9.   Apply bead of silicone to top of bulkheads and slip 
on stainless steel bulkhead cap. Also apply silicone 
to seam between overhead light tubes.