DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-500
DIG-LINE (Digital Line) 
9
Automatic Download Actions
1. System Reboot/Restart
A global download action is started when periodic maintenance tests start 
after a system reboot/restart regardless of whether the parameters have 
been downloaded previously.
2. Periodic Tests
If the download flag is still set when periodic tests are run on a terminal, a 
download action will occur. This operation is required in case a terminal 
could not be downloaded previously because it was off-hook at the time 
the system first booted or because the terminal was off-hook at the time 
translation associated with downloadable parameters was changed.
Note that it may take more than an hour for periodic tests to reach the 
terminal that needs to be downloaded.
3. Terminal Administration
A downloadable terminal is automatically downloaded when translation 
changes associated with downloadable parameters are made as part of 
system administration. As shown in the previous table, these changes can 
be for a specified terminal or may be system-wide. If the change is for 
system-level parameter, a background global update request is made to 
download all programmable terminals.
This global update may take more than an hour for a system with several 
thousand programmable terminals.
4. Port Insertion
Whenever maintenance software initiates a request to place a port into 
service, a terminal download action is started on that terminal if that 
terminal is programmable. This port insertion action occurs under the 
following circumstances:
a. A digital line circuit pack that is physically inserted into the system 
has ports currently administered for programmable terminals.
If more than 20 port insertion requests are received within a few 
seconds, a global download request is started up as a background 
task. This action updates all programmable terminals instead of just 
those being inserted. This is done to avoid system overload for 
situations where there is massive board insertion. This could occur 
when connectivity to an EPN is reestablished after that EPN was 
down.
b. A station port is added to the system by a "add station" or "change 
station" command.
c. A TTI port is activated.