Quantum acl 4 安装指导

下载
页码 68
 Chapter 2 Unpacking the Library
Packing the Library for Shipment
ACL 4/52 Facilities Planning and Installation Guide
17
Packing the Library for Shipment
2
If it becomes necessary to ship the library, you must repack it in its 
original shipping materials as explained in this section. The following 
are the main steps in this procedure:
Removing power from the library
Removing the left cosmetic panel
Unloading the library
Installing the internal packing materials
Replacing the cosmetic panels
Moving the library onto the shipping pallet
Securing the library to the pallet
Removing Power from 
the Library
2
To remove power from the library:
1 If necessary, unload and eject any tapes in the tape drives.
2 Turn off the library by setting the power switch to the O (off) 
position.
3 Disconnect all SCSI cables from the back of the library. 
Leave the power cord connected.
Caution:
Do not disconnect the power cord from the library or the 
grounded power source until instructed to do so. While 
plugged in, the power cord grounds the library chassis and 
helps to prevent electrostatic discharge (ESD) damage.
Removing the Left 
Cosmetic Panel
2
To remove the left cosmetic panel:
1 At the back of the library, remove the three screws that secure the 
left side panel to the library frame.
2 Pull the panel toward the back of the library (to disengage the 
retention tabs) and then move the panel from the library frame (see 
figure 10 on page 12).
Carefully set the left panel aside.