Quantum acl 4 安装指导
Chapter 2 Unpacking the Library
Packing the Library for Shipment
Packing the Library for Shipment
18
ACL 4/52 Facilities Planning and Installation Guide
Unloading the Library
2
To unload the library:
1 Remove all tapes from the fixed storage bins.
To do this, grasp the exposed end of each tape and lift it out of the
bin.
bin.
2 Remove any tapes in the load port bins.
Load port bins are accessible from inside the library. To remove a
tape from the load port, grasp the exposed end and lift it out.
tape from the load port, grasp the exposed end and lift it out.
3 Remove any ejected tapes from the tape drives.
4 If you ejected any tapes prior to turning off the library, they may be
in the drive slots. Remove each tape carefully from the drive; make
sure the tape is completely unloaded (not buckled to the take-up
leader) before completely removing it.
sure the tape is completely unloaded (not buckled to the take-up
leader) before completely removing it.
5 For more information, refer to the ACL 4/52 Operator’s Guide.
Installing the Internal
Packing Materials
Packing Materials
2
To install the packing materials:
1 Install the foam blocks as shown in figure 12 on page 14 and
explained below:
a
Gently raise the vertical carriage and place the vertical carriage
foam block into position. Lower the vertical carriage onto the
foam block.
foam block into position. Lower the vertical carriage onto the
foam block.
b
Install both the top and bottom horizontal carriage foam
blocks.
blocks.
c
Gently slide the horizontal carriage toward the back of the
library and against the horizontal carriage foam blocks.
library and against the horizontal carriage foam blocks.
2 Install four tie-wraps to secure the extension axis, the vertical
carriage, and the horizontal carriage as shown in figure 11 on
page 13 and explained below:
page 13 and explained below:
a
Route the two horizontal carriage tie-wraps through the notch
on the vertical rail and secure them through the notch on the
frame.
on the vertical rail and secure them through the notch on the
frame.
b
Route the extension axis tie-wrap around and back up through
the extension axis platform and secure it around the gripper
motor.
the extension axis platform and secure it around the gripper
motor.
Note:
Do not route the tie-wrap over the gripper motor power cable.
c
Route the vertical axis tie-wrap under the bumper standoff and
secure it around the extension axis platform.
secure it around the extension axis platform.