SPYDER® BACNET® PROGRAMMABLE CONTROLLERS
19
63-2689—05
Fig. 22. Controller wiring diagram (model PUB6438S 
shown) for RP7517B pneumatic transducer.
CHECKOUT
Step 1. Check Installation and Wiring
Inspect all wiring connections at the controller terminals, and 
verify compliance with installation wiring diagrams. If any wiring 
changes are required, first be sure to remove power from the 
controller before starting work. Pay particular attention to:
— 24 Vac power connections. Verify that multiple controllers 
being powered by the same transformer are wired with the 
transformer secondary connected to the same input 
terminal numbers on each controller. Use a meter to 
measure 24 Vac at the appropriate terminals (see Fig. 12 
on page 9). Controller configurations are not necessarily 
limited to three devices, but the total power draw, including 
accessories, cannot exceed 100 VA when powered by the 
same transformer (U.S. only).
— Be sure that each controller has terminal 3 wired to a 
verified earth ground, using a wire run as short as possible 
with the heaviest gauge wire available, up to 14 AWG (2.0 
sq mm) with a minimum of 18 AWG (1.0 sq mm) for each 
controller in the group (see Fig. 12 on page 9).
— Check that the MS/TP network polarity has been connected 
properly on each controller. BACnet MS/TP is polarity 
sensitive; communication will be lost for the entire segment 
if one controller is connected improperly (see Fig. 13 on 
page 11).
— Verify that Triac wiring of the digital outputs to external 
devices uses the proper load power and 24 Vac common 
terminal (digital output common terminals) for High-Side 
switching.
NOTE: All wiring must comply with applicable electrical 
codes and ordinances or as specified on installa-
tion wiring diagrams.
For guidelines for wiring run lengths and power budget, see 
VERIFY END-OF-LINE TERMINATION RESISTOR 
PLACEMENT
The installation wiring diagrams should indicate the locations 
for placement of the end of line termination resistors. See 
Fig. 13 on page 11. 
Correct placement of the end-of-line termination resistors is 
required for proper L
ON
W
ORKS
® Bus communications.
Step 2. Startup
Refer to Fig. 23 and the following text for startup information.
Fig. 23. LED, service, and network connection locations.
SET THE MS/TP MAC ADDRESS
The MS/TP MAC address DIP switches are used to set the 
unit's MAC address. Each Spyder BACnet on an MS/TP 
network must have a unique MAC address in the range of 0-
127 (address 0 should be avoided as it is the Honeywell factory 
default MAC address for all MS/TP devices).
CONTROLLER STATUS LED:
The LED on the front of the controller provides a visual 
indication of the status of the device. When the controller 
receives power, the LED appears in one of the following 
allowable states, as described in Table 8.
AO-1 COM AO-2 AO-3 COM
UI-1 COM UI-2 UI-3 COM UI-4 UI-5 COM UI-6
DI-1 DI-2 COM DI-3
20V DC
DI-4
NET
-2
NET
-1
SHLD
EGND
24 V
AC
24V
AC COM
DO-1
COM
DO-2
DO-3 DO-4
DO-5
COM
DO-6 COM
12345678
1
0
9
2345678 0
9
1
1 1111111 2
1
12345678 0
9
2
2 2222222 3
3
12345678 0
9
3
3
3
3
3
3
3
3 4
M29339B
24 VAC
AO1
24 VAC 
COM
1
2
USE 1/4 IN (6 MM) PNEUMATIC TUBING. MINIMUM BRANCH LINE
MUST BE 6 FT. (1.8M) OR LONGER.
TERMINALS 21, 23, AND 24 ARE ANALOG OUTPUTS.
+
-
BLUE
BLACK
BROWN
PNEUMATIC
VALVE 
ACTUATOR
RP7517B
1M
2B
M
2
1
DO-7 DO-8 COM
SBUS1 SBUS2
BACnet MS/TP MAC
ADDRESS DIP SWITCHES
TERMINALS 1-8
TERMINALS 9-20
TERMINALS 21-40
AO-1 COM AO-2 AO-3 COM
UI-1 COM UI-2 UI-3 COM UI-4 UI-5 COM UI-6
DI-1 DI-2 COM DI-3
20V DC
DI-4
NET
-2
NET
-1
SHLD
EGND
24 V
AC
24V
AC COM
DO-1
COM
DO-2
DO-3 DO-4
DO-5
COM
DO-6 COM
1 2 3 4 5 6 7 8 
2 3 4 5 6 7 8  0 
1  1 1 1 1 1 1 1  2 
1 2 3 4 5 6 7 8  0 
2 2 
2 2 2 2 2 2  3 
1 2 3 4 5 6 7 8  0 
3 3 
3 3 
3 4 
M29340A
HOST
STATUS LED
DO-7 DO-8 COM
SBUS1 SBUS2
BACnet 
STATUS LED
LOCAL BACnet MS/TP 
MOLEX CONNECTOR PINS