Enterasys D2G124-12P Installationsanweisungen

Seite von 76
Unpacking the D2 Switch
2-2 Installation
Unpacking the D2 Switch
Shipped With the Switch
Inspect the contents for any signs of physical damage. Contact Enterasys Networks if it is 
damaged. Refer to 
for details. The contents of the package include:
D2 switch
RJ45 to DB9 adapter (for use with the RJ45 console port if necessary)
Various documentation, including an optional policy license, if purchased
One power supply module and AC cord
Optional rubber feet (for using the switch as a freestanding device)
Optional Components
Optional components shipped separately from the D2 switch include the following:
One or more additional power supply module(s) for redundancy, either D2‐PWR or 
D2‐PWR‐POE
D2‐HIPWR‐POE power combiner
One of the following installation kits:
Rack mount installation kit (D2‐RMT)
Table mount installation kit (D2‐TBL‐MNT)
Wall mount installation kit (D2‐WALL‐MNT)
Metal lockbox wall mount installation kit (D2‐LOCKBOX)
Optional plastic cover (D2‐COVER‐W)
Note: Unpack the D2 switch components only as needed. Leave the components in their 
respective shipping cartons until you are ready to install that component. Save all shipping 
materials in the event that the switch has to be repacked.
Note: Both power supplies must be of the same type to support redundancy.