The following mounting options are available for the D2 switch. Each requires that you purchase a 
separate mounting kit. Proceed to mount the switch in your desired location using one of the 
procedures described in this section:
Install the switch in the rack mount kit and mount the switch to a 48.26‐centimeter (19‐inch) 
rack or other secure location, as described in 
Install the switch in a table mount kit and mount the switch under a table, as described in
 
Install the switch in a wall mount kit and mount the switch on a wall, as described in
 
Install the switch in a lockbox kit and mount the switch on a wall, as described in
Installing the Switch into a Rack
The D2 switch can be single or dual‐mounted in a standard EIA‐310‐D compliant 48.26‐centimeter 
(19‐inch) equipment rack. To mount one or two switches into a rack, you must first install each 
switch into a rack mount kit as described in the following procedure. You must provide the 
mounting hardware to attach the assembled kit to the rack rails. 
Complete the following steps to install one or two switches in the rack mount kit:
1.
2.
3.
4.
Caution: Before installing the screws as described in this installation procedure, refer to “
Precaución: Antes de retirar los tornillos, tal como se describe en las instrucciones de instalación, 
consulte “
Note: The D2-PWR-POE is taller than one rack unit high. If you have installed one or more 
D2-PWR-POE power supplies in the rack mount kit, ensure that your rack installation location 
leaves at least one rack unit of free space above the mounted assembly kit.