Enterasys D2G124-12P Installationsanweisungen
Order of Installation Steps
Enterasys D-Series Hardware Installation Guide 2-3
Order of Installation Steps
Once you have chosen a suitable site, you can proceed to install the D2 switch components.
Depending on the mounting option you choose, and whether you decide to use the switch as a
freestanding device, the order in which you complete the installation may vary. Use the following
steps as a guideline:
Depending on the mounting option you choose, and whether you decide to use the switch as a
freestanding device, the order in which you complete the installation may vary. Use the following
steps as a guideline:
1.
Attach an antistatic wrist strap to your wrist.
2.
Determine a suitable location for the D2 installation and proceed with one of the following
options:
options:
a.
b. “
c.
d. “
e.
3.
Connect power to the switch. Refer to “
4.
Connect to the console port. Refer to “
5.
Connect to the network (including installing optional SFPs). Refer to “
6.
Install the optional plastic cover. Refer to “
7.
Complete the installation. Refer to “
Using the Switch as a Freestanding Device
If you are installing the D2 switch as a freestanding device, choose an appropriate flat, secure
location, such as a desk top, and:
location, such as a desk top, and:
1.
If desired, install the optional rubber feet underneath the switch by affixing one securely in
each of the four corners.
each of the four corners.
2.
(Optional) Connect the D2‐HIPWR‐POE power combiner as described in “
3.
Proceed to connect power to the switch as described in “