Cisco Cisco Prime Infrastructure 2.0 Betriebsanweisung

Seite von 53
Cisco Plug and Play Application Solutions Guide 
 
 
 
Figure 1 Cisco Plug and Play Deployment of ISR at the Branch 
Installing the Cisco Plug and Play Server Components 
Cisco Prime Infrastructure 2.0 provides integrated Plug and Play Solution in a single box.  No separate 
installation of Cisco Plug and Play Gateway is required for non-DMZ deployment. The installation of 
Cisco Plug and Play Gateway in DMZ deployment is also made simpler compared to the earlier versions 
(Cisco Prime Infrastructure 1.2). 
Use the following table to identify the required installation steps, and then follow the sections in this 
document to install the server side components.  
Network 
Deployment 
Prime Infrastructure 
Version 
Install Action 
Non DMZ  
PI 2.0 and higher 
Note: Prime Infrastructure  
installation includes Plug and Play 
Gateway 
Please follow th
 section. (No separate Plug 
and Play Gateway installation is required) 
Non DMZ 
PI 1.2  
Note: Separate installation of Prime 
Server and Plug and Play Gateway is 
required 
1.  Please follow 
section 
2.  Please follow 
 section 
DMZ 
PI 2.0 and higher 
Note: Separate installation of Prime 
Server and Plug and Play Gateway is 
required for this deployment 
1.  Please follow 
section 
2.  Please follow 
 section 
 
DMZ 
PI 1.2 
Note: Separate installation of Prime 
Server and Plug and Play Gateway is 
required for this deployment 
1.  Please follow 
 section 
2.  Please follow 
 section 
 
 
Installing and Setting Up the Cisco Prime Infrastructure 
The Cisco Plug and Play Gateway is integrated in the Cisco Prime Infrastructure 2.0.  The Cisco Prime 
Infrastructure server installation includes the installation of Cisco Plug and Play gateway as well. It is 
recommended to use Prime Infrastructure 2.0 for the Cisco Plug and Play Solution. 
Please follow the steps documented in the Cisco 
 to install Prime 
Infrastructure 2.0 on your network.