Nokia of America Corporation BBTRX-22 Benutzerhandbuch

Seite von 141
Item #
Description
Yes
(Y)
No
(N)
N/A
Comments
8.
If tower is greater than
60 meters (200 feet) high,
are antenna cable shields
grounded at midpoint and
both ends?
Y
N
N/A
9.
Is ice bridge bonded at both
ends and at 7.62-meter
(25-foot) intervals?
Y
N
N/A
10.
Are all ground connections
in compliance with
Alcatel-Lucent
requirements (exothermic
weld, compression type
with 2-hole lugs; properly
secured; antioxidant used
on contact surface area)?
Y
N
N/A
11.
Are all grounding
conductors routed as
straight as possible with no
loops or sharp bends?
Y
N
N/A
12.
Is antenna support structure
grounded?
Y
N
N/A
13.
Are metallic conduits
bonded at both ends and at
7.62-meter (25-foot)
intervals?
Y
N
N/A
14.
Are all fence corner posts
and gate posts properly
grounded (including fence
fabric and barbed wire, as
applicable)?
Y
N
N/A
15.
Are all metallic objects in
the vicinity bonded to the
grounding system?
Y
N
N/A
16.
Is AC/DC power supply
equipped with a surge
protection device and is the
device properly connected
to the ground system?
Y
N
N/A
Site preparation checklists
SP-3 site preparation protective earth (PE) grounding
checklist
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
A-6
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
B25 RRH4x30
3MN-02023-0001-RJZZA
Issue 0.02
January 2015
D
R
AFT
D
R
AFT