SP-2 site preparation power source checklist
The following items must be completed prior to the installation of the base station site
equipment. Circle the correct letter for the corresponding item descriptions.
Item
#
Description
Yes
(Y)
No
(N)
N/A
Comments
1.
Is DC service available?
Y
N
N/A
2.
Have DC service and conduits
been approved by local code?
Y
N
N/A
3.
Is DC service equipped with surge
protection at service entry point?
Y
N
N/A
4.
Is DC power source appropriate for
equipment being installed?
Y
N
N/A
5.
Does DC service have proper
circuit breaker rating(s) and
labeling?
Y
N
N/A
6.
Is DC circuit breaker(s) available
and labeled for power system?
Y
N
N/A
7.
Is DC circuit breaker(s) available
and labeled for listed ancillary
equipment?
Y
N
N/A
A.
Y
N
N/A
B.
Y
N
N/A
C.
Y
N
N/A
8.
Do tower lighting, intrusion
lighting, etc. feeds have proper
lightning protection?
Y
N
N/A
Site preparation checklists
SP-2 site preparation power source checklist
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
A-4
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
B25 RRH4x30
3MN-02023-0001-RJZZA
Issue 0.02
January 2015