Utica Boilers UB90-200 Installationsanweisungen

Seite von 50
21
Check Gas Supply
• Gas pipe to boiler must be correct size for length of 
run and total Btuh input of all gas utilization equipment 
connected to it. 
• See Tables 9 and 10 for proper size. Refer to NFPA54 
for additional tables.
• Verify your gas line complies with local codes and gas 
company requirements.
Table 8  - Gas Supply Pressure
Pressure
Natural Gas
Propane Gas
Minimum
4” w.c.
10” w.c.
Maximum
10” w.c.
14” w.c.
Please check line pressure while unit is running.
Table 9  - Natural Gas Piping Sizes
Pipe Length
Pipe Capacity - BTU/Hr. Input 
(1)
½”
¾”
1”
1¼”
20’
92,000
190,000
350,000
625,000
40’
63,000
130,000
245,000
445,000
60’
50,000
105,000
195,000
365,000
Table 10  - Propane Gas Piping Sizes
Pipe 
Length
Pipe Capacity - BTU/Hr. Input 
(1)
Copper Tubing 
(2)
Iron Pipe
⅝”
¾”
½”
¾”
20’
131,000
216,000
189,000
393,000
40’
90,000
145,000
129,000
267,000
60’
72,000
121,000
103,000
217,000
(1)
Includes Fittings
(2)
Outside Diameter
Connecting Gas Piping
Refer to Figure 14 for general layout at boiler. Gas line 
enters boiler through left side panel.
Boiler is equipped with ½” NPT connection on gas valve for 
supply piping and ½” NPT ball valve for manual shut off. 
Following rules apply:
1. 
Use only those piping materials and joining methods 
listed as acceptable by the authority having jurisdiction, 
or in the absence of such requirements, National Fuel 
Gas Code, ANSI Z223.1/NFPA 54.
2. 
Use pipe joint compound suitable for liquefied 
petroleum gas on male threads only.
3. 
Use ground joint unions.
4. 
Install sediment trap upstream of gas controls.
5. 
Use two pipe wrenches when making connection to gas 
valve to keep it from turning.
6. 
Install manual main shutoff valve in vertical pipe about 
5 feet (1.5m) above floor outside boiler jacket.
7. 
Tighten all joints securely.
8. 
Propane gas connections made by licensed propane 
installer.
9. 
Two stage regulation used by licensed propane 
installer.
10. 
Propane installer to verify Propane gas piping.
11. 
Recommend use ½” union suitable for natural and 
propane gas after ball valve to facilitate service on unit.
Leak Check Gas Piping
Pressure test boiler and gas connection before placing 
boiler in operation.
• Pressure test over 1/2 psig (3.5 kPa). Disconnect boiler 
and its individual gas shutoff valve from gas supply 
system.
• Pressure test at 1/2 psig (3.5 kPa) or less. Isolate boiler 
from gas supply system by closing manual gas shutoff 
valve.
• Locate leakage using gas detector, noncorrosive 
detection fluid, or other leak detection method 
acceptable to authority having jurisdiction. Do not 
use matches, candles, open flames, or other methods 
providing ignition source. 
• Correct leaks immediately and retest.
8 - GAS SUPPLY PIPING
Figure 15 - Gas Piping
Length of pipe or tubing should be measured from gas 
meter or propane second stage regulator.