Utica Boilers UB90-200 Installationsanweisungen

Seite von 50
22
WARNING
Electrical shock hazard.  Turn OFF electrical power 
supply at service panel before making electrical  
connections.  Failure to do so could result in death 
or serious injury.
!
  
NOTICE
Use copper conductors only.
Electrically bond boiler to ground in accordance with       
requirements of authority having jurisdiction.  Refer to 
National Electrical Code, ANSI/NFPA 70.
Electric Power Supply
Turn OFF electrical power supply at service panel and boiler 
before making electrical connections.
• Run 120 volt circuit from separate over current protection 
device in electrical service entrance panel, 15 ampere 
circuit. 
• Service switch is pre-wired and located on exterior boiler 
jacket. See Figure 15 for location of service switch, 
junction box, and power supply connection points. 
• Connect black (hot) lead from power supply to either of 
unused brass screws on service switch. 
• Connect white (neutral) lead from power supply to white 
screw on service switch. 
• Connect green (ground) lead from power supply to 
ground (green) screw on service switch. 
• Receptacle on service switch is powered regardless of 
whether switch is on or off, and could be used as power 
supply for external condensate pump if one is used.
• Run 14 gauge or heavier copper wire from boiler to 
grounded connection in service panel or properly driven 
and electrically grounded ground rod.
9 - ELECTRICAL WIRING
Figure 16 - Field Wiring Connection
Service Switch 
Junction Box