Utica Boilers UB90-200 Installationsanweisungen

Seite von 50
28
Filling Boiler With Water And Purging Air For Systems 
With Conventional Closed Type Expansion Tanks
Refer to diagrams on “Near Boiler Piping” on pages 9 and 
10 for more information.
1. 
Close all zone service valves on supply and return 
piping. Close expansion tank service valve. Drain 
expansion tank. Open feed valve and fill boiler with 
water. Hold relief valve open until water runs air free 
for five seconds to rapidly bleed air from boiler, let 
relief valve snap shut.
2. 
Open zone service valve on supply pipe for first zone. 
Open purge valve on first zone. Feed water will fill 
zone, pushing air out purge valve. Close purge valve 
when water runs air free. Close zone service valve.
3. 
Repeat step 2 for remaining zones.
4. 
Open expansion tank service valve and tank 
vent.  Fill tank to proper level and close tank vent. 
Remove handle from expansion tank service valve so 
homeowner doesn’t accidentally close it.
5. 
Open all service valves. Any air remaining trapped 
in return lines between service valves and boiler will 
push towards expansion tank when boiler is placed in 
operation.
6. 
Inspect piping system. Repair any leaks immediately.
11 - STARTUP
Water Treatment And Freeze Protection
Filling Boiler With Water And Purging Air For Systems 
With Diaphragm Type Expansion Tanks
Refer to the appropriate diagrams “Near Boiler Piping” on 
pages 10 and 11.
1. 
Close all zone service valves on supply and return 
piping. Open feed valve and fill boiler with water. Verify 
air vent is open. Hold relief valve open until water runs 
air free for five seconds to rapidly bleed air from boiler, 
let relief valve snap shut.
2. 
Open zone service valve on supply pipe for first zone. 
Open purge valve on first zone. Feed water fills zone, 
pushing air out purge valve. Close purge valve when 
water runs air free. Close zone service valve.
3. 
Repeat step 2 for all remaining zones.
4. 
Open all service valves. Any air remaining trapped 
in return lines between service valves and boiler 
are pushed towards air vent when boiler is placed in 
operation.
5. 
Inspect piping system. Repair any leaks immediately.
NOTICE
Do not use stop leak compounds or other chemicals 
not listed in this manual. Repair leaks in threaded 
connections of aluminum boiler sections. Aluminum 
threads do not seal themselves.
6. 
Systems with automatic fill valves and leaks will cause 
excessive fill water. This water contains oxygen. 
Excessive oxygen will cause the aluminum boiler to 
corrode over time.  All system leaks should be repaired 
immediately.