Boiler is equipped for residential installations. If used for 
commercial applications; additional code requirements 
must be adhered to. This may require additional controls, 
including but not limited to manual reset low water cut off, 
manual reset high temperature limit, and wiring and/or 
piping modifications.
1. 
Installation must conform to the requirements of the 
authority having jurisdiction or, in the absence of such 
requirements, to the National Fuel Gas Code, ANSI 
Z223.1/NFPA 54 and/or Natural Gas and Propane 
Installation Code, CAN/CSA B149.1.
2. 
Where required by authority having jurisdiction, 
installation must conform to the Standard for Controls 
and Safety Devices for Automatically fired Boilers, 
ANSI/ASME CSD-1.
3. 
Be certain gas input rate is correct. Over-firing may 
result in early failure of boiler components; this may 
cause dangerous operation. Under-firing may result in 
too much air for pre-mix burner causing poor or loss of 
combustion.
4. 
Never vent products of combustion from this boiler to 
enclosed space. Always vent to outdoors. Never vent to 
another room or to inside building.
5. 
Verify adequate outdoor air supply to boiler for 
complete combustion.
6. 
Follow regular service and maintenance schedule for 
efficient and safe operation.
7. 
Keep boiler area clean of debris and free from 
combustible materials, gasoline and other flammable 
vapors and liquids.
8. 
Proper through-the-wall or through-the-roof 
combustion venting shall be in accordance with 
materials and methods described in this manual. 
Installation must comply with local codes.
9. 
Boiler and related hot water heating systems are 
not do-it-yourself items. Installation and service by 
qualified professionals are required.
2 - SAFE INSTALLATION AND OPERATION
Installers - Follow local regulations with respect to 
installation of CO (Carbon Monoxide) Detectors. Follow 
maintenance recommendations in this manual.  See 
“Maintenance And Cleaning” on page 48.
Boiler Sizing
• Verify you have selected the boiler with proper capacity 
before continuing installation. AHRI Rating of boiler 
selected should be greater than or equal to calculated 
peak heating load (heat loss) for building or area(s) served 
by boiler and associated hot water heating systems. See 
“Boiler Ratings & Capacities” on page 3.
• Heat loss calculations should be based on approved 
industry methods. 
Considerations For Boiler Location
Before selecting boiler location, consider following. 
• Supplied with correct type of gas (natural gas or 
propane).
• Connected to suitable combustion air intake piping 
system to supply correct amount of fresh (outdoor) air 
for combustion. See “Combustion Air And Vent Pipe” on 
page 15.
• Connected to suitable venting system to remove 
hazardous products of gas combustion. See “Combustion 
Air And Vent Pipe” on page 15.
• Connected to suitable hot water heating system.
• Supplied with suitable electrical supply for all boiler 
motors and controls.
• Connected to properly located thermostat or operating 
control. (Not included with boiler)  
WARNING
Fire hazard. Do not install boiler on carpeting. 
Failure to follow these instructions could result in 
death or serious injury.
!
   
• Placed on level surface (DO NOT install on carpeting)
• Condensate drain line must be pitched down to floor 
drain or external condensate pump with reservoir at ¼” 
per foot (21 mm/m) (wood frame or blocks may be used 
to raise boiler).
WARNING
Improper installation, adjustment, alteration, service 
or maintenance could result in death or serious 
injury.
!