Utica Boilers UB90-200 Installationsanweisungen

Seite von 50
8
General Instructions
1. 
Packaged boiler is furnished with iron piping in front 
boiler section for supply and return connections.
2. 
Install all of radiation units (panels, radiators, 
baseboard, or tubing) and supply and return mains 
first, when installation of boiler is for new heating 
system. 
3. 
After installation of all heating system piping and 
components; make final connection of system piping to 
boiler.
4. 
Hot water boiler installed above radiation level or 
as required by authority having jurisdiction must be 
equipped with low water cut off device (included with 
boiler). 
5. 
Periodic inspection is necessary, as is flushing of float 
type devices, per low water cut off manufacturers 
specific instructions.
6. 
Proper water flow through any boiler is essential to 
proper operation and long life. Simple single or two 
zone systems with adequate flow do not require 
primary secondary piping. Systems with more zones or 
low flow require primary secondary piping.
4 - NEAR BOILER PIPING
Dielectric Isolation
1. 
Two (2) 1-1/4” X 1-1/4” female to female dielectric 
isolation unions are supplied. Install dielectric isolation 
unions at boiler supply line and return line. Install 
isolation fittings nearest boiler prior to system piping 
connections. 
2. 
Water contaminants that cause low or high pH makes 
corrosion more likely.
3. 
Do not install copper supply and return piping directly 
into aluminum boiler section castings due to galvanic 
corrosion between dissimilar metals.  
4. 
Use iron, steel bushings or pipe connectors between 
copper system piping and boiler to make final 
connection to boiler. 
5. 
Use of dielectric unions is required, supplied with boiler, 
the purpose is to electrically insulate aluminum boiler 
from remainder of the system.                          
Figure 2  - General Primary Secondary Configuration