Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1778 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Figure 103: Common Progressions in PRI Endpoint Service States
Error Log Entries and Test to Clear Values
 
CRAFT BUSYOUT OF
SIGNALING LINK
"BUSYOUT LINK LINK-NO",
OR TRANSIENT STATE FOR
CRAFT-DEMANDED LONG
TEST OF THE PORT.
CRAFT RELEASE
OF SIGNALING LINK
IF D-CHANNEL
CONTROLLING THE
B-CHANNEL IS UP,
SEND A MESSAGE
REQUESTING
TRANSITION
TO IN-SERVICE
D-CHANNEL HAS BEEN
DOWN FOR AT LEAST
90 SECONDS.
FAILED TO
RECEIVE REPLY
FROM FAR END.
MTCE WILL
PERIODICALLY
TRY TO RESEND
THE MESSAGE
RECEIVED
ACKNOWLEDGEMENT
FROM THE FAR END
RECEIVED
ACKNOWLEDGEMENT
FROM THE FAR END
FAILED TO
RECEIVE REPLY
FROM FAR END.
MTCE WILL
PERIODICALLY
TRY TO RESEND
THE MESSAGE
ADMINISTER
B-CHANNEL AS
MEMBER OF A
PRI ENDPOINT
OUT-OF-
SERVICE
NEAR END
OUT-OF-
SERVICE
FAR END
OUT-OF-
SERVICE
FAR END
PENDING
IN-SERVICE
IN-SERVICE
MAINTENANCE
NEAR END
MAINTENANCE
FAR END
MAINTENANCE
FAR END
PENDING
IN-SERVICE
CRAFT RELEASE OF
A B-CHANNEL OR
NEAR-END LINK
PROBLEM (PI-LINK OR
SYS-LINK) CLEARS UP
IF D-CHANNEL
CONTROLLING THE
B-CHANNEL IS UP,
SEND A MESSAGE
REQUESTING
TRANSITION
TO IN-SERVICE
CRAFT BUSYOUT OF B-CHANNEL
BUSYOUT PORT/PRI-ENDPOINT,
LINK PROBLEM AT NEAR END
(PI-LINK OR SYS-LINK),
DS1 BOARD NOT INSERTED,
OR DS1 BOARD FAILURE.
Table 656: PRI endpoint port Error Log Entries 
Error
Type
Aux
Data
Associated Test
Alarm
Level
On/Off
Board
Test to Clear Value
0
Any
Any
Any
test port location sh r 1
Any
None
test port location sh r 1
15 (
)
Any
Audit and Update test 
(#36)
 1 of 2