Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1840 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Procedures for Restoring the PMS Link
1. Determine the status of the PMS Link.
Enter status pms-link, and make sure that the PMS Link is not busied out for 
maintenance. If the link is “down,” then continue with the next step.
2. Where does the PMS Link connect?
Enter display system-parameters hospitality, and find out the destinations of the 
PMS Link.
3. Determine the status of the data extension.
Enter status data extension, and verify whether the data extension is in the 
in-service/idle state. If the data extension is not available, then look for the extension 
number in Alt Name field of Hardware Error Log. See 
on page 2539 for resolutions.
4. Is the external PMS device available?
Make sure that the PMS device is ON-LINE and ready for service. Check the physical 
connectivity between Data Module and the PMS device.
5. If the problem is not found in the above steps, check the C-LAN board for any problems. For 
a description about the C-LAN board and its connectivity, refer to Downloading License and 
Authentication files from RFA in Maintenance Procedures (03-300192).
When restoring the PMS link, it is necessary to execute maintenance test on different objects 
that comprise the PMS link. It is recommended that you busyout the PMS link before trying to 
restore the link. When the PMS Link is busied out, every PMS Link maintenance action is 
deactivated, and interference with tests of other MOs is prevented.
Hardware Error Log Entries and Test to Clear Values
Table 675: PMS Link Maintenance Error Log Entries 
Error
Type
Aux
Data
Associated Test
Alarm
Level
On/Off
Board
Test to Clear Value
0 (
0
Any
Any
Any
test pms-link sh r 1
18 (
)
0
busyout 
pms-link
WRN
OFF
release pms-link
257 (
Any
Link Retry test 
(#215)
MIN
WRN
1
OFF
test pms-link l
513 (
)
Any
None
test pms-link
769 (
)
Any
None
 1 of 2