Rinnai RHFE-263FAII User Manual

Page of 44
 
  Gas 
Connection    
 
 
 
 
 
 
 
 
 
 
 
 
 
The gas supply line shall be gas tight, sized and so 
installed as to provide a supply of a gas sufficient to 
meet the maximum demand of the heater without 
loss of pressure. 
A shut off valve and appliance connector valve 
should be installed in the upstream of the gas line 
to permit servicing. 
Flexible pipe and any appliance connector valve 
used for gas piping shall be types approved by 
nationally recognized agencies. 
Any compound used on the threaded joint of the 
gas piping shall be a type which resists the action 
of liquefied petroleum gas (propane / LPG). 
Check the gas supply pressure immediately 
upstream at a location provided by the gas 
company.  Supplied gas pressure must be within 
the limits shown in the Specifications section.
After completion of gas pipe connections all joints 
including the heater must be checked for gas 
tightness by means of leak detector solution, soap 
and water, or an equivalent nonflammable solution, 
as applicable.  (Since some leak test solutions, 
including soap and water, may cause corrosion or 
stress cracking, the piping shall be rinsed with 
water after testing, unless it has been determined
that the leak test solution is non-corrosive.) 
Refer to an approved pipe sizing chart if in doubt 
about the size of the gas line. 
Install manual gas cut-off valve so that it can be 
accessed for easy operation.  Do not conceal 
manual cut-off valve behind back spacer. 
  Clearances to Combustibles 
 
 
 
 
 
 
 
 
 
 
 
 
When determining where to install the appliance 
the clearances to combustibles shown in the 
figure must be followed.  Also refer to the Safety 
Behaviors an
to combustibles from the top is zero. 
d Practices section. The clearance 
Rinnai Corporation RHFE-263FA
15