Intel E7520 User Manual

Page of 58
Dual-Core Intel
®
 Xeon
®
 processor LV with Intel
®
 E7520 Chipset and Intel
®
 6300ESB ICH
April 2007
User’s Manual
Order Number: 311274-009
23
Dual-Core Intel Xeon processor LV / E7520 Chipset / 6300ESB ICH
configuration you choose.) A CD-ROM drive or additional hard drive may be installed as 
a primary slave device. Follow this procedure to install a hard drive on the evaluation 
board:
1. Verify that the jumper on the hard drive is set correctly for single or master, 
depending on your configuration.
2. Install the hard drive.  This can be done using either the IDE or SATA. 
IDE Installation:
a. Connect the short end of the IDE cable to the IDE connector J1K2 on the board. 
Ensure that the red line (pin one on the cable) is aligned with pin one of the 
connector indicated by an arrow.
b. Connect the middle connector of the cable to the hard drive. Again, ensure that 
the red line, pin one on the cable, is aligned with pin one on the hard drive.
Note:
Failure to properly align the IDE cable may damage the evaluation board and/or the 
hard drive.
SATA Installation:
a. Connect one end of the SATA cable to the hard drive connection.  Connect the 
other end to the SATA1 or SATA2 connector (J1F4 or J1G1, respectively) on the 
board.
3. Connect a power connector from the power supply to the hard drive.  The power 
connector on the SATA drive may have a plastic cover that will need to be removed.  
(Old style power connector is supported.)
4. Install the CD-ROM drive (optional). A CD-ROM drive is not included in the kit and 
is not required, but you may find it useful in loading additional software. To install it 
on the evaluation board:
a. Verify that the jumper on the CD-ROM drive is set for slave.
b. Connect the unused end of the IDE cable to the CD-ROM drive. Ensure that the 
red line, pin one on the cable, is aligned with pin one of the CD-ROM drive 
connector, indicated by an arrow.
c. Connect a large 4-pin power connector from the power supply to the CD-ROM 
drive.
5. Install the floppy drive (optional). A floppy disk drive is not included in your kit and 
is not required, but you may find it useful in loading additional software. To install a 
floppy drive on the evaluation board:
a. Connect the floppy cable to the floppy connector J1K1. Ensure that the red line 
(pin one on the cable) is aligned with pin one of the connector, indicated by an 
arrow.
b. Connect the other end of the floppy cable to the floppy drive.
c. Connect a power cable to the floppy drive. Ensure that the red line (pin one on 
the cable) is aligned with pin one on the floppy drive.
2.6.9
Connect the Video Card and Monitor
Insert a video card into the appropriate slot. Connect the monitor cable and power to 
the video card port.
Note:
Monitor and video card are not included in this Development Kit.