Henkel 97725 User Manual

Page of 26
 
4    Set Up and Operation 
4.2   Operation 
   
Fluid output can be regulated individually. Apply needle regulator with counter 
nut 15 for quantity of fluid flow. 
         Turning needle regulator right: less fluid flow. 
         Turning needle regulator left: more fluid flow. 
   
•  Pull trigger at the valve body 4. Spray operation starts. 
You will notice that you receive so called “pre-air” prior to opening fluid flow when 
pulling the trigger. When releasing trigger you still have “purging-air” after needle 
has closed, nozzle and fluid flow Has stopped. This prevents that the fluid forms 
drops instead of the desired atomization. 
4.3   Shutdown 
   
•  Hold up the finespray applicator. 
   
•  Depressurize the pressure pot. 
   
The mold release agent flows back into the pressure pot. 
4.4    Return to Operation 
   
•  Pressurize the pressure pot. 
   
•  Pull trigger at the valve body 4. Spray operation starts. 
   
The feedline will be filled.