Paradyne CSU User Manual

Page of 470
8. Troubleshooting
9128-A2-GB20-80
September 2002
8-19
Test Timeout Feature
A Test Timeout feature is available to automatically terminate a test (as opposed to 
manually terminating a test) after it has been running a specified period of time. 
It is recommended that this feature be used when the
 
FrameSaver unit is remotely 
managed through an inband data stream (PVC). If a test is accidently commanded 
to execute on the interface providing management access, control is regained 
when the specified time period expires, automatically terminating the test.
To use this feature, enable the Test Timeout configuration option, and set a 
duration for the test to run in the Test Duration (min) configuration option (see 
).
NOTE:
These configuration options do not pertain to tests commanded by the DTE, 
like a DTE-initiated External Loopback.
DBM Tests
The Test menu allows you to run PVC loopbacks and test patterns on the unit and 
its DBM interface. It is available to users with a security access level of 1 or 2. 
Currently, there are no physical tests for a BRI DBM interface. 
DBM tests are started and monitored the same as the network tests. See 
, for ISDN 
backup-related test messages appearing on the System and Test Status screen. 
See 
 on page 8-22 on for additional information.