Quantum atl 7100 Installation Instruction

Page of 68
Chapter 3  Installing the Library
Operational Setup and Checkout
26
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Operational Setup and Checkout
3
The purpose of the following procedures is to verify the proper 
operation of the library before placing the library on-line.
Applying Power to 
the Library
3
To apply power to the library:
1
Verify the following:
Actuators move freely in the horizontal and vertical 
directions
All doors are closed
All cosmetic panels are attached
Power switch in the 
O
 (off) position
2
Connect the AC power cord to the rear panel and facility 
power (see 
).
3
On the rear panel, set the 
POWER
 switch to the “|” (on) 
position (see 
).
4
After several seconds, verify that the Status Display Area 
(SDA) shows 
System On-line
.
Caution:
Using a digital voltmeter (DVM), verify that the 
facility power is 90-132VAC or 180-264 VAC @ 
47-63Hz before connecting the AC power cord.
Note:
On-line
 
is only displayed if the library power-up 
state is configured for 
On-Line
.
 Otherwise, 
S
ystem 
Off-line
 is displayed in the SDA. See the Operator’s 
Guide for more information.