Jet 131000 1ss-3c-10 - 1-ton capacity 10-ft 3-phase electric chain hoist User Guide

Page of 48
 
11
 
Figure 8 
 
Figure 9 
7.  Remove the screw and washer holding the 
end chain to the hoist (Figure 10). Mount the 
bracket of the chain container in that location 
as shown in Figure 11. 
8.  Put the chain stop into the container (Figure 
11), and operate the hoist to bring the load 
hook up until the upper limit switch is tripped. 
9.  Check the chain to ensure that all the non- 
loaded chain is completely in the container. 
 Do not put chain into the chain 
container by hand! By not following the above 
steps, the chain can become twisted or kinked 
and can damage the hoist.
 
Pre-Operation Inspection 
Inspecting the Load Chain 
Clean the chain with a solvent, and carefully 
inspect the entire load chain. Replace damaged 
chain before using the chain hoist. See “Inspection 
Procedures: Allowable Limits” on page 18 for the 
maximum pitch allowed for chain length. If the 
chain exceeds this amount, it must be replaced. 
 
Figure 10 
 
Figure 11 
Also replace the load chain if any of the following 
are identified: 
1.  Seriously rusted or cracked. 
2.  Marks on the chain surface are deeper than 
5% of the link’s diameter. 
3.  Links are twisted or deformed. 
4.  The links are stretched too long or seriously 
worn on the surface, especially at the points 
where links contact each other. 
Never extend load chain by welding a second 
piece to the original. 
 Do not operate the hoist with a 
twisted, kinked or damaged load chain. Do not 
splice the load chain.  
Check that the chain does not twist along its length 
from hoist to hook. If twist is present on units with 
multiple falls, the hook must be passed back 
through the chain loop to remove all twist in the 
chain. 
  The load chain supplied with 
your JET chain hoist is designed, 
manufactured, and tested for proper fit and