Cisco Cisco Unified MeetingPlace Audio Server Maintenance Manual
3-28
Cisco MeetingPlace Audio Server 5.2 Customer Engineering Guide (for Cisco MeetingPlace 8112)
OL-
Chapter 3 Installing the 8112 Server
Connecting the system cables
Figure 3-21 Multi Access Blade Transition Module
Step 7
Repeat steps 5 and 6 for the second trunk card cable assembly (50-pin Amphenol cable). The second
cable should go into the connectors on the left of the breakout box and on the bottom of the Multi Access
Blade.
cable should go into the connectors on the left of the breakout box and on the bottom of the Multi Access
Blade.
illustrates the 8112 server’s connections from the back of the server. This configuration
supports 480 E1 ports with one Multi Access Blade card MA-16.