Cisco Cisco TelePresence Management Suite (TMS) Version 15 Installation Guide

Page of 75
Setting up Cisco TelePresence Management Server
Cisco TelePresence Management Suite Installation and Getting Started Guide (13.1)
Page 36 of 75
 
The room in which you install Cisco TelePresence Management Server should have an ambient 
temperature between 0
º
C and 35
º
C (32
º
F and 95
º
F) and between 10% and 90% non-condensing 
relative humidity.
 
Do not place heavy objects directly on top of the server.
 
Do not place hot objects directly on top, or directly beneath the server.
 
Use a grounded AC power outlet.
Rack mounting
Note: The following procedure is optional.
Cisco TelePresence Management Server comes with rubber feet for standalone installation and brackets 
for mounting in standard 19” racks. 
Before starting the rack mounting, ensure that Cisco TelePresence Management Server is placed 
securely on a hard flat surface.
 1.  Disconnect the AC power cable.
 2.  Set up the mounting space in accordance with the site preparations described above.
 3.  Attach the brackets to Cisco TelePresence Management Server on both sides of the unit using the 8 
screws that are provided.
 4.  Insert Cisco TelePresence Management Server into a 19” rack, and secure it at the front using four 
screws.
Connecting the cables
LAN cable
Connect a LAN cable from the "LAN 1" connector on Cisco TelePresence Management Server to your 
network. The LAN 2, 3 and 4 connectors are not used and should be left open.
Power cable
Connect the system power cable to an electrical distribution socket. Press the power switch button at 
the back to 1. The power indicator LED, marked Pwr, on the front panel lights up.