Cisco Cisco TelePresence Management Suite (TMS) Version 15 Installation Guide
Installing the server
Unpacking
To avoid damage to the unit during transportation, Cisco TelePresence Management Server is delivered in a
special shipping box, which contains the following components:
special shipping box, which contains the following components:
n
Rack-ears, screws and screwdriver.
n
Cables:
l
Power cable
l
Ethernet cable
n
Cisco TelePresence Management Server
Installation site preparations
n
Make sure that Cisco TelePresence Management Server is accessible and that all cables can be easily
connected.
connected.
n
For ventilation leave a space of at least 10 cm (4 inches) behind the rear panel and 10 cm (4 inches) in front
of the front panel.
of the front panel.
n
The room in which you install Cisco TelePresence Management Server should have an ambient
temperature between 0
temperature between 0
º
C and 35
º
C (32
º
F and 95
º
F) and between 10% and 90% non-condensing relative
humidity.
n
Do not place heavy objects directly on top of the server.
n
Do not place hot objects directly on top, or directly beneath the server.
n
Use a grounded AC power outlet.
Rack mounting
Note: The following procedure is optional.
Cisco TelePresence Management Server comes with rubber feet for standalone installation and brackets for
mounting in standard 19” racks.
mounting in standard 19” racks.
Before starting the rack mounting, ensure that Cisco TelePresence Management Server is placed securely
on a hard flat surface.
on a hard flat surface.
1. Disconnect the AC power cable.
2. Set up the mounting space in accordance with the site preparations described above.
3. Attach the brackets to Cisco TelePresence Management Server on both sides of the unit using the 8
screws that are provided.
Cisco TelePresence Management Suite Installation and Upgrade Guide (14.3.1)
Page 29 of 50
Setting up Cisco TelePresence Management Server