Moving the Cisco CRS 4-Slot Line Card Chassis to Its Permanent Location
This section describes the procedures required to move the Cisco CRS 4-Slot LCC in its rack to where it will permanently reside in
your facility.
The installation of a Cisco CRS 4-Slot LCC may require space, floor loading, power, and cooling
modifications to your facility. Therefore, you should plan the site well in advance of the scheduled delivery
of the system. See the Cisco CRS Carrier Routing System Line Card Chassis Site Planning Guide .
Tip
Considerations Before Moving the Cisco CRS 4-Slot Line Card Chassis
Before you attempt to move the chassis from the loading dock to the installation site, we recommend that you inspect the proposed
transport route, note any areas of concern, and answer the following questions. Depending on the complexity and length of the
transport route, it might be useful to create a diagram of the route you plan to take from the loading dock to the installation site.
We recommend that at least two people move the chassis from the shipping dock to the installation site.
Note
We also recommend that you leave the chassis attached to its pallet for moving.
When you inspect the proposed transport route, answer the following questions:
• What type of moving device will be used to move the chassis from the loading dock or staging area to the installation site (for
example, pallet jack, forklift, or scissor lift)?
• Are all doorways and hallways wide and tall enough for the moving device and the system components?
• Are there any corners in the route to the installation site? Are the corners wide enough to accommodate the moving device and
the chassis?
The Cisco CRS 4-slot LCC needs an aisle of approximately 60 inches (152.4 cm) in width to be turned
while on a fork lift.
Note
• Can elevators support the weight of the system components and the moving device? Are the elevators tall and wide enough?
• Are there any ramps over which the components must be moved? Are ramp inclines within the allowable tolerances? For
guidelines, see the
section.
• Are there any obstacles in the way that need to be moved (for example, boxes or equipment in hallways, hanging wires, and so
on)?
If the route to the installation site has any ramps, you must use a moving device other than a scissor lift
to move the chassis over the ramps. You can then transfer the chassis onto a scissor lift for installation.Leave
the impedance carriers in place in empty card slots while you move the chassis or install it in the rack.
The impedance carriers provide support to keep the chassis square during movement and installation.