Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 174
 
 
Installing Accessories 
 
 
 
To Install the Crowbar Surge Protector 
Complete the following steps to install the crowbar surge protector in the amplifier. 
1  Open the node housing. Refer to 
To Open the Node Housing (on page 15). 
2  Using a Torx T-15 bit screwdriver, remove the amplifier cover by loosening the 
amplifier cover screws. 
 
3  Install the crowbar surge protector in the surge protector slot. Refer to the 
following illustration. 
 
Note: 
 
Make sure that all the pins on the crowbar surge protector bottom align with 
the pin holes in the surge protector slot, allowing the surge protector to 
install flat against the amplifier module. 
 
Make sure that the components face the outside of the station (see the 
preceding diagram for proper positioning). Heat shrink tubing has been 
added to prevent shorting. 
4  Secure the cover to the amplifier module and tighten the amplifier cover screws. 
Tighten slotted head screws to 6 in-lb to 9 in-lb (0.7 Nm to 1.0 Nm), or cross head 
screws from 18 in-lb to 20 in-lb (2.0 Nm to 2.25 Nm). 
Important: The cover should lie completely flat on the amplifier chassis. Make 
 
OL-29644-03 
31