Cisco Headend System Release 2.5 Installation Guide
78-738190-01 Rev B
SR 2.5 and SR 3.5 Post Upgrade Procedures
5-11
Examine and Re-Order the pddataqampat Table,
Continued
Checking the pddataqampat Table—ATM
After upgrading to SR 2.5 or SR 3.5, follow these instructions to inspect the contents
of the pddataqampat table and then to re-order the table, if necessary.
Note: Follow this procedure if the site you are upgrading uses ATM. If the site you
Note: Follow this procedure if the site you are upgrading uses ATM. If the site you
are upgrading uses Direct ASI, use the Checking the pddataqampat Table—ASI
procedure, instead.
1.
From the DNCS Administrative Console, select the Element Provisioning tab.
2.
Click BIG.
Result: The BIG List window opens
Result: The BIG List window opens
3.
Double-click the entry in the BIG List for the BFS BIG.
Result: The Set Up BFS BIG window opens.
Result: The Set Up BFS BIG window opens.