Cisco Headend System Release 2.5 Installation Guide

Page of 280
5-16 
SR 2.5 and SR 3.5 Post Upgrade Procedures 
78-738190-01 Rev B 
Examine and Re-Order the pddataqampat Table,
 Continued 
Tearing Down the BFS Sessions 
After stopping the BFS Server processes, tear down the BFS sessions. Follow these 
instructions to tear down the BFS sessions.   
 
  1.  From the DNCS tab on the DNCS Administrative Console, select Utilities 
and then click Session List
Result:  The Sessions from [host name] window opens. 
 
  2.  Click the checkbox in the Select column for all BFS sessions. 
Result:  A checkmark appears in the checkbox. 
  3.  Click Teardown Selected Sessions
Result:  The system tears down the selected sessions. 
  4.  Go to Rebooting the BIG and the BIG QAM, next in this section.