Cisco Headend System Release 2.5 Installation Guide
5-16
SR 2.5 and SR 3.5 Post Upgrade Procedures
78-738190-01 Rev B
Examine and Re-Order the pddataqampat Table,
Continued
Tearing Down the BFS Sessions
After stopping the BFS Server processes, tear down the BFS sessions. Follow these
instructions to tear down the BFS sessions.
1. From the DNCS tab on the DNCS Administrative Console, select Utilities
and then click Session List.
Result: The Sessions from [host name] window opens.
Result: The Sessions from [host name] window opens.
2. Click the checkbox in the Select column for all BFS sessions.
Result: A checkmark appears in the checkbox.
3. Click Teardown Selected Sessions.
Result: The system tears down the selected sessions.
4. Go to Rebooting the BIG and the BIG QAM, next in this section.