Cisco Headend System Release 2.7

Page of 174
 
About This Guide 
vi 
736107 Rev D 
Before you begin to stage SSC DHCTs, follow the recommendations in the first five 
chapters of the Explorer Digital Home Communications Terminal Staging Guide (part 
number 734375) regarding the staging process, staging preparations, staging area 
considerations, obtaining and loading EMM data, and staging non-SSC DHCTs. 
Also, make sure to follow the recommendations in Optimize Your System 
Performance for Downloads and Staging (on page 45) to improve the speed and 
performance of the initial staging process. 
 
 
Audience 
This guide is written for staging area personnel responsible for staging SSC DHCTs 
and CableCARD modules, DHCT/CableCARD module installation personnel, and 
system operators of the Digital Network Control System (DNCS). 
 
 
Document Version 
This is the third formal release of this document. In addition to minor text and 
graphic changes, the following table provides the technical changes to this 
document.  
Description 
See Topic 
Updated CableCARD module blink 
patterns associated with a software 
download 
DHCTs with Only POWER LED Indicators 
(on page 86) 
Added an appendix covering the staging 
toolkit 
Staging Toolkit (on page 163)