Cisco Headend Digital Broadband Delivery System Maintenance Manual

Page of 186
 
 
4004455 Rev G 
29 
 
Introduction  
This chapter contains the procedures specific to configuring the DNCS 
for EAS. It also contains the procedures for conducting EAS tests. 
Note: The procedures in this chapter are for System Release 5.0 and 
later. If you are using a System Release prior to SR 5.0, go to Configure 
the DNCS for EAS and Conduct Tests for System Releases Prior to SR 
5.0
 (on page 73). 
 
 
 
Chapter 5 
Configure the DNCS for EAS 
and Conduct Tests for SR 5.0 
and Later 
In This Chapter 
 
 
 
 
Configure EAS to Properly Function with the CableCARD 
Module 
................................................................................................... 46 
 
 
 
 
 
Conduct EAS Tests ............................................................................... 63