Cisco Cisco IP Contact Center Release 4.6.1 User Guide

Page of 797
 
2-6
ICM WebView Online Help 
Working with Reports
Change the date range format in historical reports
Step 5
Save the report definition to save your changes.
Change the date range format in historical reports
The date range you choose for historical reports appears at the top of a report. The 
default format is mm/dd/yyyy (month, day, year). You can change this format.
The format for the date range is controlled by your browser's language settings. 
WebView is currently built to detect French, Chinese, Japanese, and UK English. If 
WebView does not detect any of the preceding languages, it will default to 
US-English (mm/dd/yyyy) format.
To change the format for the date range
Step 1
Modify your browser's Language settings to select the language that uses the 
appropriate date format. For example, if you want the date format to be 
dd/mm/yyyy, select a language such as French. For more information on modifying 
the language setting, refer to your browser's help.
Step 2
Refresh the report page. The date now appears in the format of the selected 
language.
Run drill-down reports
Drill-downs allow you to launch a detailed sub-report from within the current report 
window. Once the new report is launched it can be saved as a separate report 
definition.
Drill-down reports have the same dates and times defined as the report from which 
they were launched. Although you can save the drill-down report as a separate 
report definition, the drill-down assignments remain set in the original report. You 
can open additional drill-downs from within the original report.
This section contains:
Running drill-down reports
To run drill-down reports
Step 1
On an open report window, click the Drill Down menu option.  The Choose 
Drill-Down page opens.