Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Specification Guide

Page of 336
3-19
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 3      Installing the Switch
  Installing the Cable Management System (Catalyst 6509-NEB-A Switch Only)
Step 3
Loosen the two captive installation screws on the front panel. (See 
.)
Figure 3-12 Removing the Front Panel 
Step 4
Remove the front panel, and set it aside.
Step 5
Attach the interface cables to the modules, and route the cables through the cable guide. 
Step 6
Install the front panel by hooking the top of the front panel over the cable guide.
Step 7
Tighten the two captive installation screws. (See 
.)
S
U
E
R
V
IS
O
R
2
W
S
-X
6
K
-S
U
2
-2
G
E
S
T
A
T
U
S
S
S
T
E
M
S
U
E
R
V
IS
O
R
2
W
S
-X
6
K
-S
U
2
-2
G
E
S
T
A
T
U
S
S
S
T
E
M
S
W
IT
C
H
 F
A
B
R
IC
 M
D
L
STATUS
W
S
-C
6
5
0
0
-S
F
M
S
W
IT
C
H
 F
A
B
R
IC
 M
D
L
STAT
W
S
-C
6
5
0
0
-S
F
M
O
1
2
 P
O
S
 M
M
O
S
M
-4
0
1
2
-P
O
S
-M
M
S
TA
TU
S
O
1
2
 P
O
S
 M
M
O
S
M
-4
0
1
2
-P
O
S
-M
M
S
TA
TU
S
O
1
2
 P
O
S
 M
M
O
S
M
-4
0
1
2
-P
O
S
-M
M
S
TA
TU
S
8 PORT OC3 POS MM
OSM-8OC3-POS MM
S
T
A
T
U
S
8 PORT OC3 POS
OSM-8OC3-POS MM
S
T
A
T
U
S
99970
FAN
STATUS
FAN
1
FAN
2
Captive installation screws