Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Specification Guide
3-21
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 3 Installing the Switch
Installing the Cable Management System (Catalyst 6509-NEB-A Switch Only)
Step 4
Install the standard cable guide to the back panel by hooking the lip of the cable guide to the back panel.
(See
(See
.)
Step 5
Install the two screws to secure the cable guide to the back plate. (See
.)
Note
Before installing the front panel, attach the interface cables to the modules, and route the cables
through the cable guide. See the
through the cable guide. See the
for
information on attaching the interface cables.
Step 6
Attach the interface cables to the modules, and route the cables through the cable guide.
Step 7
Install the front panel by hooking the top of the front panel over the cable guide.
Step 8
Tighten the two captive installation screws. (See
.)
Figure 3-15 Front Panel Installation
S
U
E
R
V
IS
O
O
R
2
W
S
S
-X
6
6
K
-S
U
U
2
-2
G
E
S
T
A
T
U
S
S
S
T
E
M
S
U
E
R
V
IS
O
R
2
W
S
S
-X
6
K
-S
U
U
2
-2
G
E
S
T
A
T
U
S
S
S
T
E
M
S
W
IT
IT
C
H
F
A
B
R
IC
M
D
L
STATUS
W
S
S
-C
6
5
0
0
-S
F
M
S
W
IT
IT
C
H
F
A
B
R
IC
M
D
L
STAT
W
S
S
-C
6
5
0
0
-S
F
M
O
1
2
P
O
O
S
M
M
M
O
S
M
-4
0
1
2
-P
O
S
-M
M
S
TA
TU
S
O
1
2
P
O
O
S
M
M
O
S
M
-4
0
1
2
-P
O
S
-M
M
S
TA
TU
S
O
1
2
P
O
O
S
M
M
O
S
M
-4
0
1
2
-P
O
S
-M
M
M
S
TA
TU
S
8 PORT OC3 POS MM
OSM-8OC3-POS MM
S
T
A
T
U
S
8 PORT OC3 POS
OSM-8OC3-POS MM
S
T
A
T
U
S
99970
FAN
STATUS
FAN
1
FAN
2
Captive installation screws