4-37
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 4      Removal and Replacement Procedures
  Removing and Installing the DC-Input Power Supplies
Installing the 4000 W Power Supply (Wiring for 2700 W Operation; Left Power Bay)
Refer to 
 for item location and identification on the 4000 W DC-input power supply.
Note
You should allow a minimum of 2.5 to 3 inches (63.5 mm to 76.2 mm) of space between the side of the 
power supply and any obstructions (such as the side of an enclosed equipment rack). This space is needed 
to install and secure the DC-input power cables correctly.  Incorrectly routing the DC-input power cables 
can cause airflow blockage into the power supply and inadequate strain relief in the cables. The exact 
amount of space required depends upon the gauge and flexibility of the DC-input power cables that you 
are using.
Follow these steps to install a 4000 W DC-input power supply that is wired for 2700 W operation in the 
left power bay (POWER 1):
Step 1
Ensure that the system (earth) ground connection has been made. For ground connection installation 
instructions, see the 
Step 2
Verify that power is off to the DC circuit that is connected to the power supply that you are installing. 
As an added precaution, place the appropriate safety flag and lockout devices at the source power circuit 
breaker, or place a piece of adhesive tape over the circuit breaker handle to prevent accidental power 
restoration while you are working on the circuit.
Step 3
Prepare the source DC-input power cables by attaching the appropriately sized lugs. 
The power supply terminal block lug opening width is 0.62 inch (15.8 mm). The terminal posts are 
centered 0.63 inches (15.88 mm) apart and have a 1/4-20 thread. We recommend that you use an 
appropriately sized industry standard 2-hole, standard barrel compression lug. (See 
power supply ground studs, located below the terminal block, also have 1/4-20 threads and require two 
1/4-inch split-ring washers and two 1/4-20 hex nuts. 
The DC-input wires and the DC power supply ground wires should be sized according to the local and 
national installation requirements. Use only copper wire. For North American installations, use 
90°C-rated, fine-strand copper conductors.
Figure 4-28 DC Power Cable Lug
Crimp area
120563
2.25
.25
.37
.63
Ø .267
2 holes
All measurements in inches