Aperto Networks PM365-BS User Manual
3–4
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 3. Installing the Base Station IDU
B. Mount the base station on a 19” rack, with the screws included with the base sta-
tion.
shows mounting of base station with the screws.
i. Attach Rack Mount Brackets to side at each PM 5000 IDU.
ii. Pass the 4X1/4-20 TRUSS HEAD SCREW through the 4xNUT RETAINER.
iii. Mount the PM 5000 IDU on to the rack by securing the screw on to the rack.
Figure 3-2
Mounting Base Station -PM 5000
C. Ground the Base Station
i. Using the ground lug located in the lower left side of the back panel (See
), ground the base station using either a 10 or 12 Gauge standard
insulated copper wire.
ii. Be sure to observer all grounding and lightning requirement as described in
Chapter 4.
Table 3-B
Parts List and Part Numbers
Parts
Part Numbers
Description
a
10007456
Serial Cable
b
10002537
Nut Retainer (U-Style)
c
PM BSU-CD-ROM
PacketMax Software and Documentation
CD-ROM
d
10004194
Screw Cover (plastic)
e
10002438
1/4-20x0.75 in long Truss Head Screw
Mount the Base Station in
rack