Equipment layout
Page 18
Senstar LM100 Product Guide
Use a site plan to mark the locations for the Senstar LM100 components:
LM100 gateway - indicate the location and note the address for network based systems
LM100 luminaire AP - indicate the location for the Access Point
LM100 luminaires - indicate the location, the segment groupings, and zone boundaries (on the 
site plan, number the luminaires in the order that will be used to form segments)
Power supply - indicate the type and capacity of power supply and the power distribution plan
Alarm communication wiring - relay output or network alarm communications
Power cable - indicate the type and length of power cables that will be used
Wireless Gate Sensor - the number of protected gates and the number of WGSs required to 
cover them
Installation overview
Installing a Senstar LM100 system is a four step process:
1. Inspect and if necessary, repair the fence and the surrounding area.
2. Plan and design the system.
3. Install the Senstar LM100 gateway, luminaire AP and luminaires.
ground rod
power supply
power cable
data cable
4. Setup and calibrate the system.
Figure 8: Example site plan