Baicells Technologies Co. Ltd. BRU3510 User Manual
8
2. Installation Preparation
Supporting Materials
2.1
Prepare accordingly the following supporting materials, given as Table 2-1.
Table 2-1 Supporting Materials for Installing Base Station
Name
Description
Power line
< AWG16,e.g., AWG14
Shorter than 350m (1150 feet)
Antenna feeder
50 ohm feeder
Cable
Outdoor CAT5, CAT5e
Antenna
Omnidirectional, or directional antenna
Ground wire
16mm² yellow/green wire
GPS
GPS antenna, N type cable, and GPS mounting bracket
Installation Tools
2.2
The following tools are needed during the installation.
Level bar
Marking pen
Knife
Vice
Wrench
Percussion drill and
some drill heads
hammer
Cross
screwdriver
Cable vice
Tape measure
5mm L-shape allen
hexagon wrench
Water-proof
tape
Insulating tape
Ladder