Baicells Technologies Co. Ltd. BRU3510 Manuel D’Utilisation

Page de 27
 
 
2.   Installation Preparation 
  Supporting Materials 
2.1
Prepare accordingly the following supporting materials, given as Table 2-1. 
Table 2-1 Supporting Materials for Installing Base Station 
Name 
Description 
Power line 
< AWG16,e.g., AWG14 
Shorter than 350m (1150 feet) 
Antenna feeder 
50 ohm feeder 
Cable 
Outdoor CAT5, CAT5e
 
Antenna 
Omnidirectional, or directional antenna 
Ground wire 
16mm² yellow/green wire 
GPS 
GPS antenna, N type cable, and GPS mounting bracket 
 
  Installation Tools 
2.2
The following tools are needed during the installation. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Level bar 
Marking pen 
Knife 
Vice 
Wrench 
 
 
 
 
 
 
 
 
 
Percussion drill and 
some drill heads 
hammer 
Cross 
screwdriver 
Cable vice 
Tape measure 
 
 
 
 
 
5mm L-shape allen 
hexagon wrench 
Water-proof 
tape 
Insulating tape 
Ladder