Hitachi RAF-35RPA RAF35RPA User Manual

Product codes
RAF35RPA
Page of 706
 
MISCELLANEOUS NOTE
 
15-6
 
 
 
 
 
 
4.  Remove the bushing that is attached to the base. 
5.  Remove the securing screw of the heat exchanger. 
6.  Lift up the heat exchanger and create a gap of 
approximately 10mm between the base and the lower 
surface of the heat exchanger. 
 
7.  Insert the hot pipe into the top of the base from the 
gap. 
 
 
 
 
8.  Return the heat exchanger to the original position, and 
fasten the screws. Bend the hot pipe so that the flare 
nut is approximately 10cm from the service valve.  
9.  The net at the rear side will accelerate snow 
accumulation. The snow on the net may not defrost 
even by defrosting from the heat exchanger. Therefore, 
cutting the net and reassemble all removed parts in 
step 3.  
10.  Connect the pipes and the hot pipe between the 
smaller side service valve and the smaller pipe. Adjust 
the length of the smaller pipe by cutting off the excess.  
11.  Connect the connecting cord to the terminal board.  
12.  Vacuum the air inside the system.  
13.  Check for gas leakage at the service valve.  
14.  Perform test to make sure the unit is operating 
correctly before reinstalling the unit. 
 
Applicable models 
Hot-pipe part # 
RAC-35WPA 
RAC-25YH4 500 
 
Hot pipe 
Slide cover 
Nut 
Slide cover 
Motor support 
Propeller fan 
Partition part 
Motor support 
Screw 
Partition part 
Screw 
Valve seat 
Heat 
exchanger 
Screw 
Condenser 
Service 
valve 
Electrical parts 
Front cover 
Bend the hot 
pipe 
Hot pipe 
Hot pipe 
Service 
valve 
Heat exchanger 
Hot pipe entrance 
Cut off and remove lower part of 
the net and leave the upper 2 steps